Vernon Township Fire Station #432

Garmong, along with the design partners, led the Vernon Township Fire Territory through the design and construction of its first new station through the Build-Operate-Transfer statute. The station is 12,100 square feet and accommodates 10  firefighters. Recognizable to the community as a fire station but designed with the residential and suburban context in mind, the single-story structure has the sleeping, day and support spaces efficiently connected to the apparatus bays to maximize response time.

Employee Portal
This is default text for notification bar