Vernon Township Fire Station #432
Garmong along with the design partners led the newly formed Vernon Township Fire Territory through the design and construction of its first new station through the Build-Operate-Transfer statute. The station is 12,100 square-feet and accommodates 10 firefighters. Recognizable to the community as a fire station but designed with the residential and suburban context in mind, the new single story structure has all of the sleeping, day and support spaces efficiently connected to the apparatus bays to maximize response time.